Project File · Public records
Every public record we have for Apple Reno data center
Sparks, Washoe County, NevadaExpandingFirst public 2012Filing entity: Apple Inc.Last checked Nov 9, 2026
Records marked draft were traced to their source by an AI research agent and have not passed verification yet.
What the public record holds
19 of 19 records
2026
Utility proceedingDecidedSep 3, 2026Public Utilities Commission of Nevada
Sierra Pacific Power Company d/b/a NV Energy, Interim Order Approving Gross-Up of Contributions in Aid of Construction (CIAC) Rate
Interim order (October 7, 2026) approving a gross-up of the CIAC rate for Sierra Pacific Power: new large loads, including data centers, reimburse NV Energy's tax cost on customer-funded construction contributions. The Q5 WG2 sweep recorded an interim gross-up rate of about 25.16 percent per testimony and a final gross-up rate of 23.6482 percent from secondary reporting of the order; the signed order's text was not opened in either sweep, so the rate figures are reported, not verified.
26-09005
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionMay 29, 2026Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
NV Energy seeks PUCN approval of its large-load service agreement with Amazon Data Services for the Storey County campus; a prehearing conference was set for July 14, 2026. Agreement terms are in the docket filing (not read this pass).
26-05026
Draft research, not yet verifiedLast checked Nov 11, 2026Where it says this
PUCN docket information list, Docket 26-05026 caption and filing date 05/29/2026; PUCN Connection calendar (July 2026) lists the prehearing conference for July 14, 2026.
Utility proceedingPending before the commissionMay 6, 2026Public Utilities Commission of Nevada
Joint Application of Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy for approval of their 2027-2046 integrated resource plan (2026 Joint IRP), proposing the Large Load Electric Service Agreement
The 2026 Joint IRP (filed May 6, 2026; 41 volumes) builds its large load planning framework on the Large Load Electric Service Agreement (LLESA), the standard agreement for customer loads of 25 MW or greater. Under the framework, large load additions pay for the infrastructure needed to serve them through customer-specific charges that operate as contributions in aid of construction toward generation and transmission additions, minimum demand and energy charges, security requirements, and termination payments; NV Energy plans on a Base Load Forecast and a reduced Base Minus forecast to isolate the costs that would not be incurred but for large load requests. The Commission's statutory decision deadline runs to December 2, 2026. Approval of the LLESA framework is requested in this docket; each signed LLESA is also filed in its own approval docket.
26-05007
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Volume 1 (transmittal letter dated May 6, 2026; joint application for the 2027-2046 IRP) and Volume 2, Narrative (planning framework anchored by the LLESA; customer-specific charges as CIAC, minimum demand and energy charges, security requirements, termination payments; LLESA applies to loads of at least 25 MW; statutory resolution date December 2, 2026). Both volumes re-read firsthand in this pass.
Utility proceedingPending before the commissionMar 5, 2026Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of revisions to Tariff No. 1, Rule 9 (Line Extensions), addressing large load and data center service requests
Companion Rule 9 (line extension) revisions to the LLESA framework, filed March 5, 2026: customer-specific charges for Rule 9 (contract-required) generation additions, return of unused contract-required generation amounts, and security requirements when the interconnection study begins. The proposed security is a letter of credit or cash equal to the greater of 50 percent of forecasted 24-month bills at full load or $10 million, with a readiness milestone schedule.
26-03009
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
2025
Air permitIssuedJun 13, 2025Northern Nevada Public Health, Air Quality Management Division
Northern Nevada Public Health, Air Quality Management Division, AAIR16-0082
Synthetic Minor Source Permit to Construct issued to Apple, Inc., 21505 Reno Technology Parkway, Sparks, NV 89442
- Potential emissions nox:
- 95 tons per 12-month rolling period
- Backup generators:
- 40 engines
- Stated in the filing:
- Wells 2, 3, and 4 wells referenced
- Generator capacity:
- 137 MW
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Permit cover page and Facility Emissions Unit List, pages 1-2 of 17
Public decisionFiledJan 23, 2025Washoe County Parcel Map Review Committee
Washoe County Parcel Map Review Committee, WTPM24-0007
Staff report for the February 13, 2025 hearing on dividing Apple's 180.92-acre parcel APN 084-191-08 into 177.65 acres and a 3.27-acre parcel for a fire station; staff recommends approval
- Parcel acres:
- 180.92 acres
- Stated in the filing:
- 10 feet
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Staff report cover and Case Description (page 1); Tentative Parcel Map Evaluation and Development Information (page 6)
2024
Public decisionFiledJul 25, 2024Nevada Governor's Office of Economic Development
Nevada Governor's Office of Economic Development, 7-B
Board packet for Apple's Data Center Tax Abatement application (expansion): sales tax abated to a 2 percent rate for 10 years, estimated abatement $62,153,275
- Employees:
- 80 full-time employees
- Stated in the filing:
- $48 per hour
- Jobs new reported:
- 10 full-time employees
- Stated in the filing:
- $33 per hour
- Campus acres:
- 1,700 acres
- Stated in the filing:
- 440,000,000 kWh per year
- Estimated cost:
- $75 million
- Data center buildings:
- 4 buildings
- Related investment:
- $742.1 million
- Stated in the filing:
- 50 MW
- Total investment:
- $992.1 million
- Stated in the filing:
- 200 MW
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Packet pages 1 (application facts), 2 (EDAWN letter, June 25, 2024), 3 (Apple letter, July 11, 2024), 5-6 (application form), 8 (real estate and construction form)
Public decisionApprovedJul 25, 2024Nevada Governor's Office of Economic Development
Nevada Governor's Office of Economic Development
Apple, Inc. approved for $62,153,275 in tax abatements for the expansion of its data center operations at the Reno Technology Park
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Release of July 25, 2024, Apple, Inc. bullet
Tax agreementJul 25, 2024Washoe County
Partial tax abatement for data centers (NRS 360.754)
Sales and use tax abated to a 2 percent rate for 10 years, per the board packet abatement table; no personal property tax abatement appears in the packet's abatement table for this approval. Data center track as filed: 10 new full-time employees within five years at an average wage of $32.51 (statutory wage floor $29.28); $742,071,428 of capital equipment investment within five years; health insurance with the company paying 82 percent of the premium. Expected expanded operation March 2025.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Board packet page 1 (Tax Abatements table); GOED release of July 25, 2024, Apple, Inc. bullet
Utility proceedingDecidedMay 28, 2024Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Contract Tariff Template (CTT) for companies constructing certain generation and transmission facilities or purchasing energy, capacity, and/or ancillary services from third-party providers
The Contract Tariff Template lets a large customer self-supply part of its load from third-party generation and storage while NV Energy balances and delivers it, under a 10-year minimum term (no more than 20 years). Approval came by stipulation: the Commission voted to accept the stipulation on March 11, 2025 (the stipulation was filed January 24, 2025 and signed by Regulatory Operations Staff, the Bureau of Consumer Protection, Microsoft, Google, and Switch). Tariff sheets filed April 16 and 18, 2025 state that the customer remains responsible for all costs and risks as if NV Energy supplied the full bundled requirement. The customer class overlaps NV Energy's data center load: Microsoft, Google, and Switch are parties, and the Rule 30 style Schedule CTT is the template the WECC peers cite.
24-05022
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading. CTT terms and the March 11, 2025 stipulation vote also per the Commission's April 2026 newsletter (Tariff Corner), staged as nv-pucn-newsletter-2026-04 and read firsthand by the Q5 WG2 sweep.
2017
Development agreementFiledNov 28, 2017Washoe County Board of County Commissioners
Washoe County Board of County Commissioners
Development Agreement with Apple, Inc. introduced (first reading) on November 28, 2017, after Apple's purchase of the Reno Technology Park and Sparks Energy Park; second reading scheduled December 12, 2017
- Stated in the filing:
- Reno Technology Park and Sparks Energy Park land purchased
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Washoe Life post of November 29, 2017, item 1
2016
Utility proceedingDecidedSep 30, 2016Public Utilities Commission of Nevada
Application of Switch Ltd. to Purchase Energy, Capacity, and/or Ancillary Services from a Provider of New Electric Resources (second 704B application)
The Commission's December 28, 2016 order approved a settlement of Switch's second 704B application. For the new Tahoe Reno load at issue for this campus, the settlement carried no impact fee, because Switch had given notice it would not take permanent service at that location; the staff agreement is dated December 8, 2016, and describes the Tahoe Reno operations at 6.2 million square feet.
16-09023
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09); AWEC Opening Comments in Oregon PUC Docket UM 2024, page 15 (approval through settlement) citing Docket No. 16-09023 Order (Dec. 28, 2016)
2015
Utility proceedingDecidedNov 30, 2015Public Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc.
Sierra Pacific, the NV Energy utility serving Storey County, sought Commission approval of Renewable Energy Agreements with Switch, Ltd. and Apple Inc. This is the record that grounds Sierra Pacific Power as the serving utility for the Citadel campus: the northern utility, not Nevada Power, contracted with Switch for renewable energy supply in the north.
15-11025
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (caption and filing date, read firsthand 2026-11-09)
2012
Public decisionApprovedJun 30, 2012Nevada Governor's Office of Economic Development
Nevada Governor's Office of Economic Development
Tax abatements for Apple, Inc. (new, Washoe County, IT) approved; contract date June 30, 2012 in GOED's biennial table
- Total investment:
- $400 million
- Stated in the filing:
- $38 per hour
- Jobs total reported:
- 33 jobs
- Stated in the filing:
- $25 per hour
- Expected jobs:
- 35 jobs
- Total investment:
- $689.8 million
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
FY2012 Approved Tax Abatements table, row 24 (Apple, Inc); FY2012 audit results table, row 24
Tax agreementJun 30, 2012Washoe County
Personal property and sales tax abatements (NRS 274 program for businesses in a Community Development Block Grant eligible area, as described in the county endorsement record)
Washoe County's record of the request: 85 percent of personal property taxes abated, no abatement of real property requested; the county stated its own abatement cost at $6.2 million net present value. GOED's biennial table prints $28,900,000 and $26,403,689 in its abatement columns for Apple; the published text layer does not align those figures unambiguously to the sales and personal property columns, so they are recorded in the document facts narrative, not as a typed schedule. As stated to the county: the business would be maintained and operated in Nevada for at least 10 years; Apple stated a $400 million investment commitment over the first four years and $1 billion over ten years. GOED audit findings later reported $689,829,656 invested, 33 jobs, and a $38.42 average wage.
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Washoe County minutes, Item 12-576 (Finance Director's Table 1 summary); GOED biennial report, FY2012 tables, row 24
Public decisionApprovedJun 26, 2012Washoe County Board of County Commissioners
Washoe County Board of County Commissioners, 12-576
Endorsement of Apple's application to the Nevada Commission on Economic Development for abatement of personal property and sales taxes for a new business at Reno Technology Park approved (motion by Chairman Larkin, seconded by Commissioner Weber, motion duly carried; no tally printed)
- Construction jobs:
- 300 jobs
- Announced investment:
- $400 million
- Maximum electrical load:
- 10 MW
- Announced investment:
- $1 billion
- Campus acres:
- 350 acres
- Tax exemption percent:
- 85 percent
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
Minutes of June 26, 2012, Item 12-576 (Agenda Item 31), pages 2-4
No date in the record(rules in force and undated records)
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Vantage Data Centers
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05028
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Amazon Data Services, Inc.
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05026
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Utility proceedingPending before the commissionNo date in the recordPublic Utilities Commission of Nevada
Application of Sierra Pacific Power Company d/b/a NV Energy for approval of a Large Load Electric Service Agreement with Fleet Technology (an Amazon affiliate as captioned in the Commission list)
Project-specific Large Load Electric Service Agreement (LLESA) approval docket, filed alongside the 2026 Joint IRP (Docket 26-05007), which proposes the LLESA framework for loads of 25 MW or greater: customer-specific charges operating as contributions in aid of construction, minimum demand and energy charges, security requirements, and termination payments. The agreement itself is NV Energy's own filing in the Commission's docket; its project-specific terms sit in the docket filings, which this pass did not open.
26-05027
Draft research, not yet verifiedLast checked Nov 9, 2026Where it says this
PUCN docket information list (Commission's own docket system), as read firsthand by the Q5 WG2 sweep on 2026-11-08 and staged as this source. The list is session-based; this conversion pass could not re-open it (two failed fetches, 2026-11-09), so captions and statuses rest on the WG2 reading.
Records we are still collecting
These records are normally public. We have not collected them for this project yet; each will appear above with its source when found.
- Building and site permits
Building permits, site plans, grading, certificates of occupancy. Usually held by: City or county building department.
- Water supply and use
Water service agreements, water rights, use reports. Usually held by: Water utility and state water agency.
- Courts and disputes
Lawsuits, appeals, settlements. Usually held by: State and federal courts.
- Company filings
Business registrations of filing entities, securities filings. Usually held by: Secretary of state business registry; SEC.
Sources
- 1Washoe County Parcel Map Review Committee Staff Report, Case WTPM24-0007 (TMFPD), January 23, 2025
Washoe County Community Services Department, Planning and Building DivisionTier 1 · Captured 2026-11-09 · Open the source - 2Apple, Inc. Data Center Tax Abatement Board Packet (Item 7-B, GOED Board, July 25, 2024)
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 3GOED Biennial Report to the Legislature on Abatements from Taxation, FY2010-FY2020 (81st Session Exhibit AREV856I)
Nevada Legislature (report of the Governor's Office of Economic Development, filed as a committee exhibit)Tier 1 · Captured 2026-11-09 · Open the source - 4Top headlines from the Board of County Commissioners meeting, November 28, 2017 (Washoe County)
Washoe County (Washoe Life)Tier 1 · Captured 2026-11-09 · Open the source - 5Five abated companies to invest $1 billion and generate $308 million in tax revenue (GOED release, July 25, 2024)
Nevada Governor's Office of Economic DevelopmentTier 1 · Captured 2026-11-09 · Open the source - 6Washoe County Board of County Commissioners Minutes, June 26, 2012
Washoe County ClerkTier 1 · Captured 2026-11-09 · Open the source - 7Synthetic Minor Source Permit to Construct AAIR16-0082, Apple, Inc. (issued June 13, 2025)
Northern Nevada Public Health, Air Quality Management DivisionTier 1 · Captured 2026-11-09 · Open the source - 8PUCN docket information list (all utilities)
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 9Opening Comments of the Alliance of Western Energy Consumers, Oregon PUC Docket UM 2024 (filed March 16, 2020)
Public Utility Commission of Oregon (party filing of the Alliance of Western Energy Consumers)Tier 2 · Captured 2026-11-09 · Open the source - 10The PUCN Connection newsletter, April 2026 edition
Public Utilities Commission of NevadaTier 1 · Captured 2026-11-08 · Open the source - 112026 Joint Integrated Resource Plan Volume 1 (Nevada Power and Sierra Pacific, Docket 26-05007)
NV EnergyTier 2 · Captured 2026-11-08 · Open the source - 122026 Joint IRP, Volume 2 (Narrative), Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy
NV EnergyTier 1 · Captured 2026-11-09 · Open the source - 13Apple CEO in Reno for Warehouse Groundbreaking (AP, 2018-01-18)
Associated Press via Industrial Equipment NewsTier 3 · Captured 2026-11-08 · Open the source
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page