FederalHouse of Representatives119th CongressBill
H.R. 10579: House version of the FERC large load interconnection rule bill
Official title: Energy Cost Fairness and Reliability Act of 2026
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
Filed as of Sep 24, 2026. The official record says: introduced.
- Filed (current stage)
- In committee (not reached)
- Passed one chamber (not reached)
- Passed both chambers (not reached)
- Signed into law (not reached)
- In effect (not reached)
What it means for a household (draft rating)
Helps households. The bill directs the Federal Energy Regulatory Commission to check that costs from large load interconnections do not shift to other customers.
"the Commission shall, consistent with State authority, review the cost allocation methodologies to ensure that the costs of transmission services, network upgrades, or related facilities necessitated by the interconnection or operation of large load facilities are not shifted to other customers"Sec. 3, new Federal Power Act Sec. 224, cost allocation review paragraph, introduced text
We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.
What it does
We have not quoted its provisions yet. The official text has them.
Who it touches
This is a federal action. It can reach any of the 1320 projects we track; it states no size threshold we can check, so we list none.
Who acted
- CosponsorRep. Goldman, Daniel S. [D-NY-10]House, district NY-10, D
- Primary sponsorRep. Min, Dave [D-CA-47]House, district CA-47, D
Timeline
Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.
- · HouseIntroduced in HouseStage: Filed
- · HouseIntroduced in House
- · HouseReferred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.Stage: In committee
- · HouseReferred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
More from Federal
- S. 5653 · FiledRewrites permitting and transmission cost rules affecting data centers
- H.R. 9340 · Passed one chamberSets federal cost rules for grid upgrades serving large loads
- H.R. 10570 · FiledMakes data center nondisclosure clauses unenforceable in court
- H.R. 10448 · FiledEnds bonus depreciation for qualified data center property
- H.R. 10321 · FiledDirects DOE to set best practices for siting data centers
- H.R. 10118 · FiledBars members of Congress from signing certain data center NDAs
Sources
- 1All Info - H.R. 10579 - 119th Congress: Energy Cost Fairness and Reliability Act of 2026
Congress.gov, Library of CongressTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "H.R. 10579: House version of the FERC large load interconnection rule bill." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/us-119-hr-10579
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page