DelawareHouse of Representatives153rd General AssemblyBill
HB 233: Separate utility rate class for large energy use facilities
Official title: AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO LARGE ENERGY USE FACILITIES.
Draft research, not yet verified: traced to the official record by an AI research agent; an editor has not checked it yet.
Where it stands
In effect as of Aug 26, 2026. The official record says: signed into law.
- Filed (done)
- In committee (done)
- Passed one chamber (done)
- Passed both chambers (done)
- Signed into law (done)
- In effect (current stage)
What it means for a household (draft rating)
Helps households. The law makes a large energy use facility pay at least 90 percent of its contract capacity in distribution charges.
"Obligate the large energy use facility to pay a minimum amount or percentage of distribution charges, which cannot be less than 90% of contract capacity, based on the large energy use facility's projected electricity usage for the electricity services the Commission-regulated electric utility is contracted to provide for the duration of the contract."26 Del. C. Sec. 203G(c)(3) (as added by HS 1 for HB 233)
We rate a bill as helping or costing households only when its own text says who pays or who is exempt. Otherwise it is unclear. This is a draft rating and has not been verified yet.
What it does
Contract term
Applies to: large energy use facilities (years)
“Specify the duration of the contract, which must be a minimum of 10 years commencing after load ramp and a minimum of 15 years total including the load ramp period.”
26 Del. C. Sec. 203G(c)(1), as enacted
Who pays for grid costs
Applies to: large energy use facilities
“Directly assign all costs related to distribution infrastructure investments required to interconnect a large energy use facility incurred by the Commission-regulated electric utility directly to the large energy use facility; any costs that cannot be directly assigned must be assigned to the class of customers for large energy use facilities and not to any other class of customers.”
26 Del. C. Sec. 317(e)(1)a., as enacted
Definition · threshold 50 MW
Applies to: large energy use facilities
“"Large energy use facility" means a facility that does either or both of the following: 1. Uses or is projected to use a monthly maximum demand of 50 megawatts or greater at a load factor of 85% or greater. 2. Uses a monthly maximum instantaneous demand of 100 megawatts or greater.”
HS 1 for HB 233, Sec. 1 (new 26 Del. C. Sec. 102 definition)
Demand response
Applies to: large energy use facilities
“All Commission-regulated electric utilities shall develop a load shed protocol to allow large energy use facilities to be curtailed in anticipation of or during emergency conditions, including the installation of any necessary equipment or technology before a customer is interconnected.”
26 Del. C. Sec. 317(b), as enacted
Certification
Applies to: large energy use facilities
“No person or entity may begin operations as a large energy use facility served by a Commission-regulated electric utility without first obtaining from the Commission the approval of an electric service agreement ("ESA") and entering into a transmission security agreement ("TSA") with the Commission-regulated electric utility.”
26 Del. C. Sec. 203G(a), as enacted
Minimum payment · threshold 90 percent of contract capacity
Applies to: large energy use facilities
“Obligate the large energy use facility to pay a minimum amount or percentage of distribution charges, which cannot be less than 90% of contract capacity, based on the large energy use facility's projected electricity usage for the electricity services the Commission-regulated electric utility is contracted to provide for the duration of the contract.”
26 Del. C. Sec. 203G(c)(3), as enacted
Electric rate class
Applies to: large energy use facilities
“Commission-regulated electric utilities must, within 180 days after finalization of the regulations under Sec. 203G of this title, establish a classification of service for retail electricity consumers that are large energy use facilities.”
26 Del. C. Sec. 317(a), as enacted
Reporting duty
Applies to: Commission-regulated electric utilities
“Commission-regulated electric utilities shall be required to provide to the Commission annually detailed, project-specific information for each anticipated large energy use facility, including development status, evidence of financial commitment, ramp schedules, and any duplicative interconnection requests.”
26 Del. C. Sec. 203G(i), as enacted
Who it touches (1)
Projects this may apply to, from the bill's own place and size rules. Each says who has checked it so far.
- Possible match, AI could not decide; waiting for a person · Nov 29, 2026Project Washington
The act covers large energy use facilities, facilities that use or are projected to use a monthly maximum demand of 50 megawatts or greater at a load factor of 85 percent or greater, or a monthly maximum instantaneous demand of 100 megawatts or greater, served by a Commission-regulated electric utility; this project has 1,530 MW on record (generator capacity), but the project's monthly maximum demand and load factor is not on record.
“"Large energy use facility" means a facility that does either or both of the following: 1. Uses or is projected to use a monthly maximum demand of 50 megawatts or greater at a load factor of 85% or greater. 2. Uses a monthly maximum instantaneous demand of 100 megawatts or greater.” (HS 1 for HB 233, Sec. 1 (new 26 Del. C. Sec. 102 definition))
Rule checks: Project is in Delaware; 1,200 MW on record (not stated), threshold 50 MW (HS 1 for HB 233, Sec. 1 (new 26 Del. C. Sec. 102 definition)). Still to check: who it covers: not checked
Who acted
- Primary sponsorRep. BurnsHouse of Representatives
- SponsorRep. HeffernanHouse of Representatives
- SponsorRep. Minor-BrownHouse of Representatives
- SponsorSen. HansenSenate
Timeline
Every official action on record, oldest first. An action that moved the bill to a new stage names that stage.
- · House of RepresentativesConsidered in the House Natural Resources Committee; the sponsor described the forthcoming substitute adding long-term financial commitments for large energy use facilitiesStage: In committee
- · House of RepresentativesHouse Substitute No. 1 released (the version later enacted)
- · GovernorSigned by Governor Meyer as 85 Del. Laws c. 440; effective on signingStage: In effect
More from Delaware
- SB 312 · In effectBans nondisclosure agreements hiding large data center projects
- SB 353 · Died or failedMoratorium on data center development through January 2027
Sources
- 1House Substitute No. 1 for House Bill No. 233 (153rd General Assembly), full text
Delaware General AssemblyTier 1 · Open the source - 2Delaware Code Title 26, Chapter 1, Subchapter II (incl. Sec. 203G)
Delaware Code Online (Delaware General Assembly)Tier 1 · Open the source - 3Delaware Code Title 26, Chapter 1, Subchapter III (incl. Sec. 317)
Delaware Code Online (Delaware General Assembly)Tier 1 · Open the source - 4House Natural Resources Committee meeting minutes, January 28, 2026 (HB 233 consideration)
Delaware General AssemblyTier 1 · Open the source
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "HB 233: Separate utility rate class for large energy use facilities." Bill Watch. Updated 2026-11-12. Accessed 2026-11-29. https://datacenterfactcheck.org/policy/bills/de-2025-hb-233
No corrections have been published for this page. Corrections log · Report an error or send a tip on this page