Utility commission
Rate Class 30, Large General Service (100 kW and Over)
Where it stands: In effect as of Mar 1, 2026
Draft research, not yet verified. Open a source to check any detail.
What it is
The cooperative's largest general service rate class, and its only schedule above general service. It applies to commercial and industrial consumers with a metered peak demand load greater than 100 kW in each month of the preceding calendar year, delivered at a single point of delivery, and is not available for resale or standby service. Current charges are a delivery charge of $110.00 per month, an energy charge of $0.0645 per kWh and a demand charge of $11.25 per kW. The cooperative's published summary states no minimum demand percentage, no contract term, no collateral, no exit fee and no data center or megawatt-scale class. The Oregon Public Utility Commission does not set this cooperative's rates; its elected board does, and Oregon HB 3546 (2025) does not reach consumer-owned utilities.
The facts
- Regulator
- Board of Directors, Wasco Electric Cooperative
- Type
- Large load tariff
- Utility
- Wasco Electric Cooperative
- Status date
- Mar 1, 2026
- Large-load rules
- Yes, for loads of 0.1 MW or more
Sources
- 1Rate Schedule Summary, effective March 1, 2026
Wasco Electric Cooperative, Inc.Tier 1 · Rate Schedule Summary, effective March 1, 2026, Large General Service (100 kW and Over), Rate Class 30 (delivery, energy and demand charges); cooperative Electric Rates page for the single point of delivery and no resale or standby terms · Open the source
Report an error or send a tip on this page
Cite this page
Copy this citation when you reuse a figure or a finding from this page.
Data Center Fact Check. "Rate Class 30, Large General Service (100 kW and Over)." Last activity 2026-03-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-wasco-ec-rate30