Rate Class 30, Large General Service (100 kW and Over)

Where it stands: In effect as of Mar 1, 2026

Draft research, not yet verified. Open a source to check any detail.

What it is

The cooperative's largest general service rate class, and its only schedule above general service. It applies to commercial and industrial consumers with a metered peak demand load greater than 100 kW in each month of the preceding calendar year, delivered at a single point of delivery, and is not available for resale or standby service. Current charges are a delivery charge of $110.00 per month, an energy charge of $0.0645 per kWh and a demand charge of $11.25 per kW. The cooperative's published summary states no minimum demand percentage, no contract term, no collateral, no exit fee and no data center or megawatt-scale class. The Oregon Public Utility Commission does not set this cooperative's rates; its elected board does, and Oregon HB 3546 (2025) does not reach consumer-owned utilities.

The facts

Regulator
Board of Directors, Wasco Electric Cooperative
Type
Large load tariff
Utility
Wasco Electric Cooperative
Status date
Mar 1, 2026
Large-load rules
Yes, for loads of 0.1 MW or more

Sources

  1. 1
    Rate Schedule Summary, effective March 1, 2026
    Wasco Electric Cooperative, Inc.
    Tier 1 · Rate Schedule Summary, effective March 1, 2026, Large General Service (100 kW and Over), Rate Class 30 (delivery, energy and demand charges); cooperative Electric Rates page for the single point of delivery and no resale or standby terms · Open the source

Report an error or send a tip on this page

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Rate Class 30, Large General Service (100 kW and Over)." Last activity 2026-03-01. Accessed 2026-11-29. https://datacenterfactcheck.org/dockets/utility/proc-wasco-ec-rate30