Draft research. Every default and project value comes from our research files and has not passed verification yet.
How many homes use as much electricity as a data center?
Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona
Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.
About as much electricity in a year as
96,100 to 134,900 homes
Most likely about 126,500 homes in Oregon, for QTS Hillsboro data center campus at 200 MW.
Yearly electricity: about 1,314 GWh (range 999 to 1,402 GWh).
Precision: Fair2 of 4
- Capacity: From our records, with a source.
- Local homes: State average. Utility data would be sharper.
- What kind of facility: Facility type and what the MW figure measures narrow the range.
- Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.
Estimated range. Not a forecast, and not a bill.
Your data centers, side by side
Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.
| Data center | Capacity | Homes (likely) | Yearly GWh | Compared with |
|---|---|---|---|---|
| QTS Hillsboro data center campusMain | 200 MW | 126,500 | 1,314 | Oregon |
| Together | 126,500 | 1,314 | Each site against its own local homes. |
How it works
- Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier.
200 MW × 1 = 200 MW (likely) - Yearly electricity: facility power times 8,760 hours times how hard it runs.
200 MW × 8,760 h × 75% = 1,314,000 MWh - Homes: that total divided by what one home uses in a year.
1,314,000 MWh ÷ 10.390 MWh = 126,468 homes (shown rounded)
This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.
Sources
- 1Form EIA-861 final 2025 detailed data files
U.S. Energy Information AdministrationTier 1 · Open the source - 2EIA Form 861 2025, Sales to Ultimate Customers file
U.S. Energy Information AdministrationTier 1 · Open the source - 3QTS Announces Development of Mega Data Center on 250+ Megawatt Hillsboro, Oregon Campus (2020-02-18)
QTS Realty Trust (PRNewswire release, republished)Tier 4 · Open the source - 4QTS opens mega data center in Hillsboro, OR
QTS Realty Trust (release republished by Cabling Installation & Maintenance)Tier 4 · Open the source - 5Standard Air Contaminant Discharge Permit No. 34-0222-ST-01, Addendum No. 5, QTS Investment Properties Hillsboro, LLC
Oregon Department of Environmental QualityTier 1 · Open the source - 6MOX and QTS Team up to Deliver New and Diverse Connectivity From the New QTS Hillsboro Mega Data Center (2021-09-17)
MOX Networks and QTS (Business Wire release, republished)Tier 4 · Open the source - 7Joint Petition of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC to Increase Green Tariff Customer Supply Option Capacity (UM 2202)
Public Utility Commission of Oregon (joint filing of Portland General Electric Company and QTS Investment Properties Hillsboro, LLC)Tier 1 · Open the source - 8Order No. 21-468, UM 2202 (entered December 20, 2021)
Public Utility Commission of OregonTier 1 · Open the source - 9Petition for Waiver of QTS Investment Properties Hillsboro, LLC (New Large Load Cost-of-Service Opt-Out Agreement)
Public Utility Commission of Oregon (filing of QTS Investment Properties Hillsboro, LLC)Tier 1 · Open the source - 10Cleaner Air Oregon facility page: QTS Investment Properties Hillsboro, LLC
Oregon Department of Environmental QualityTier 1 · Open the source - 11QTS Development Process Case Study, NE Huffman Street site
City of Hillsboro, OregonTier 1 · Open the source - 12Q&A: Enterprise Zone Agreements with Data Centers in Hillsboro
City of Hillsboro, OregonTier 1 · Open the source - 13Part A - Enterprise Zone Business Projects - 2024 Exemptions on Qualified Property
Business Oregon (Oregon Business Development Department), published on data.oregon.govTier 1 · Open the source - 14Part A - Enterprise Zone Business Projects - 2025 Exemptions on Qualified Property
Business Oregon (Oregon Business Development Department), published on data.oregon.govTier 1 · Open the source - 15Part A - Enterprise Zone Business Projects - 2026 Exemptions on Qualified Property
Business Oregon (Oregon Business Development Department), published on data.oregon.govTier 1 · Open the source - 16Avangrid and Portland General Electric Collaborate with QTS and Meta to Build 120 MWac Solar Project in Oregon
QTS Data Centers (joint release with Avangrid and Portland General Electric, published on q.com)Tier 1 · Open the source - 17
- 18
- 19Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
EPRITier 2 · Open the source - 20Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
Uptime InstituteTier 2 · Open the source
Questions people ask
- How many homes use as much electricity as a data center?
- About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
- How many homes does 1 MW of data center power equal?
- About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
- Is a data center's MW figure what it actually uses?
- No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
- Why does the answer change by utility?
- Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.
Embed this calculator
Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.
<iframe src="https://datacenterfactcheck.org/calculators/mw-to-homes/embed" title="MW to homes calculator" width="100%" height="640" loading="lazy"></iframe>