How many homes use as much electricity as a data center?

Short answer: about 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.

Read: Your tornado warning starts in two data centers: Manassas, Virginia and Phoenix, Arizona

Pick data centers we track, or enter your own numbers. We compare with homes served by the same utility when we have that data, and show how precise the estimate is.

The address holds your inputs, so a link shows the same calculation.

Start from

Your data centers

Pick as many as you like. The one marked main drives the big result.

  • Crusoe Abilene AI factory campus for MicrosoftTaylor County, Texas

Crusoe Abilene AI factory campus for Microsoft: Under construction. Announced capacity 900 MW

Fine-tune every input
How hard it runs, percent of capacity (low, likely, high)
Overhead multiplier, used only for computer-equipment figures

About as much electricity in a year as

337,300 to 473,400 homes

Most likely about 443,800 homes in Texas, for Crusoe Abilene AI factory campus for Microsoft at 900 MW.

Yearly electricity: about 5,913 GWh (range 4,494 to 6,307 GWh).

Precision: Fair2 of 4

  • Capacity: From our records, with a source.
  • Local homes: State average. Utility data would be sharper.
  • What kind of facility: Facility type and what the MW figure measures narrow the range.
  • Measured use: The operator's own reported yearly electricity for this site would replace our estimate. None in our records yet.

Estimated range. Not a forecast, and not a bill.

Your data centers, side by side

Sites with the operator's reported use show that measured figure; the others use the same settings as above. Each is compared with the most local homes we have for that site. Where we have neither, enter a capacity to include it.

Selected data centers compared
Data centerCapacityHomes (likely)Yearly GWhCompared with
Crusoe Abilene AI factory campus for MicrosoftMain900 MW443,8005,913Texas
Together443,8005,913Each site against its own local homes.

How it works

  1. Total facility power: if the number covers computer equipment only, multiply by the overhead multiplier. 900 MW × 1 = 900 MW (likely)
  2. Yearly electricity: facility power times 8,760 hours times how hard it runs. 900 MW × 8,760 h × 75% = 5,913,000 MWh
  3. Homes: that total divided by what one home uses in a year. 5,913,000 MWh ÷ 13.323 MWh = 443,819 homes (shown rounded)

This does not capture ramp-up over years, peak demand at the hottest hour, or anything about bills.

Sources

  1. 1
    Form EIA-861 final 2025 detailed data files
    U.S. Energy Information Administration
    Tier 1 · Open the source
  2. 2
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Open the source
  3. 3
    Crusoe Announces New 900 MW AI Factory Campus in Abilene, Texas to Support Microsoft AI Infrastructure (2026-03-27)
    Crusoe
    Tier 4 · Open the source
  4. 4
    Notice of Receipt of Application and Intent to Obtain Air Permit (NORI), Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263, Longhorn Data Center Buildings 9 and 10
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  5. 5
    Plain Language Summary for New Source Review (NSR), Initial Application for Air New Source Review Permit Numbers 182126, GHGPSDTX263 and PSDTX1688, Longhorn Data Center (RN112029061)
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  6. 6
    Notice of Application and Preliminary Decision for Air Quality Permits, Proposed Air Quality Permit Numbers 182126, PSDTX1688, and GHGPSDTX263
    Texas Commission on Environmental Quality
    Tier 1 · Open the source
  7. 7
    TABS Project Details: Abilene Building 9, Building 9 Core & Shell (CS), TABS2026008297
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  8. 8
    TABS Project Details: Abilene Building 9, Building 9 Tenant Improvement (TI), TABS2026008308
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  9. 9
    TABS Project Details: Abilene Building 10, Building 10 Core & Shell (CS), TABS2026008318
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  10. 10
    TABS Project Details: Abilene Building 10, Building 10 Tenant Improvement (TI), TABS2026008329
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  11. 11
    TABS Project Details: Abilene Building 9, Administration and Warehouse Buildings, TABS2026023929
    Texas Department of Licensing and Regulation
    Tier 1 · Open the source
  12. 12
    The Totally Easy Agenda: Abilene City Council - December 4, 2025
    City of Abilene
    Tier 1 · Open the source
  13. 13
    The Totally Easy Agenda: Abilene City Council - December 18, 2025
    City of Abilene
    Tier 1 · Open the source
  14. 14
    Chapter 312 Tax Abatement Agreements detail file (registry download), last updated 2026-10-10
    Texas Comptroller of Public Accounts
    Tier 1 · Open the source
  15. 15
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Open the source
  16. 16
    Uptime Institute Global Data Center Survey 2024: regional view (UII Data Report 154)
    Uptime Institute
    Tier 2 · Open the source

Questions people ask

How many homes use as much electricity as a data center?
About 62,600 average U.S. homes for every 100 MW running at a typical 75 percent. The real number depends on the site and its neighbors.
How many homes does 1 MW of data center power equal?
About 630 average U.S. homes for each megawatt, if the site runs at 75 percent of its capacity all year and a home uses 10,491 kWh a year (2025). Pick a site to compare with homes on its own utility.
Is a data center's MW figure what it actually uses?
No. Announced capacity is the most a site can draw, and many sites ramp up over years. Where an operator reports its yearly electricity use, this calculator uses that measured figure instead.
Why does the answer change by utility?
Homes use different amounts of electricity in different places, mostly because of climate and heating. Comparing with homes on the same utility, then the same state, gives the most local answer we have data for.