Carbon estimate calculator Beta

How much carbon dioxide does a data center's electricity use release?

Short answer: A 100 MW data center using 75 percent of its capacity would use about 657,000 MWh a year. At the average rate of the power plants in Virginia (537 pounds of carbon dioxide per MWh, 2023), that is about 160,000 metric tons a year.

Turn a data center's yearly electricity into carbon dioxide, using the average rate of the state's power plants.

Beta. A new kind of calculator. The method and every input are shown, but it has not been through a full editor review yet. Tell us what is wrong with the error form.

Example value. Use the megawatts announced or approved.MW

Carbon dioxide each year, at the state's average rate

about 160,000 metric tons

Between 122,000 and 171,000 metric tons, depending on how much of its capacity the data center really uses.

Rate: 537 pounds per MWh for Virginia, data year 2023. Use factor.

A grid average, not what a company's power contracts say. Construction is not counted.

How it works

metric tons = MW × 8,760 hours × use factor × the state's pounds of CO2 per MWh × 0.4536 ÷ 1,000

Sources

  1. 1
    EIA Form 861 2025, Sales to Ultimate Customers file
    U.S. Energy Information Administration
    Tier 1 · Draft research, not yet verified · Open the source
  2. 2
    eGRID2023 Summary Tables (Revision 2)
    U.S. Environmental Protection Agency
    Tier 1 · Draft research, not yet verified · Open the source
  3. 3
    Annual and Peak Electricity Use: History and Future Projections (Powering Intelligence 2026)
    EPRI
    Tier 2 · Draft research, not yet verified · Open the source
  4. 4
    Measuring the Environmental Impact of Delivering AI at Google Scale
    Google (Elsworth et al.)
    Tier 4 · Draft research, not yet verified · Open the source
  5. 5
    The Gentle Singularity
    Sam Altman (OpenAI CEO)
    Tier 4 · Draft research, not yet verified · Open the source

Questions people ask

How much carbon dioxide does a data center's electricity release?
A 100 MW data center using 75 percent of its capacity would use about 657,000 MWh a year. At the average rate of the power plants in Virginia (537 pounds of carbon dioxide per MWh, 2023), that is about 160,000 metric tons a year.
Is this the data center's real footprint?
No. It uses the average of every power plant in the state, for the year shown. A company may buy clean power, a utility may serve it from a different mix, and the grid changes every year. It also leaves out the carbon from building the data center and its equipment.
Where does the rate come from?
From the U.S. Environmental Protection Agency's eGRID, which reports the average carbon dioxide released per MWh by the generators in each state.

Calculator version 0.1 (beta). A change to the method gets a new version; the inputs are in the address, so a shared link shows the same result.

Cite this page

Copy this citation when you reuse a figure or a finding from this page.

Data Center Fact Check. "Carbon estimate calculator." Accessed 2026-11-29. https://datacenterfactcheck.org/calculators/carbon

Embed this calculator

Paste this code where your page accepts HTML. The calculator runs on this site, so it stays current when the method or the defaults change. Set the height to fit your page.

<iframe src="https://datacenterfactcheck.org/calculators/carbon/embed" title="Carbon estimate calculator" width="100%" height="640" loading="lazy"></iframe>